1. Approved Integration Path
    1. no volume milestones
    2. start work within the next cycle

Total Ask: $35k Stables

Chatted w/ Apo: said to axe the bottom two and tweak top to start work at the start of the next cycle. If we dont want to integrate it now, will we ever want to integrate it was the answer—I sorta agree


  1. “Do it when engineering has bandwidth”
    1. no volume milestones
    2. start work when engineering has bandwidth (case by case)

Total ask: $20k Stables

  1. “dev now, pay later”
    1. start work next cycle (1-month cycles)